Intermediate checks should be documented without changing the gage’s established calibration schedule. GAGEtrak can retain the check on the existing Gage ID when the calibration record is completed with a Non-Calibration disposition.
Record the intermediate check
1. Create a new calibration record. Open the existing gage and add the record under the same Gage ID.
2. Enter the check details. Record the date, the person who performed the check, and any applicable results, measurements, standards, findings, or attachments.
3. Enter Verification in Calibration Type. Calibration Type is a free-text field, so your organization can use a consistent description that matches its documented procedure.
4. Set Disposition to Non-Calibration. This tells GAGEtrak that completing the record should not update the gage’s calibration-done and next-due dates.
1 Verification in Calibration Type 2 Non-Calibration disposition 3 Completed 4 Confirmation message
Complete and retain the record
5. Select Completed. GAGEtrak displays a confirmation explaining that records with a Disposition of Failed or Non-Calibration do not update the calibration-done and next-due dates for the gage.
6. Choose Yes to continue. The intermediate check is retained in the calibration history for the original Gage ID.
6. Save the record.
What this accomplishes
The completed record provides objective evidence of the intermediate check while preserving the existing calibration schedule. It does not:
-
Replace the gage’s Last Calibrated date
-
Recalculate the gage’s Next Due date
-
Restart the regular calibration interval
Document enough information to support the decision
The record should show what was checked, the reference or standard used, the result obtained, the applicable acceptance criteria, and any action taken. This creates a usable history for identifying drift and evaluating potentially affected measurements if a later check is unacceptable.
Terminology tip: Use one consistent Calibration Type description for these records so they are easier to find and report on later. This example uses “Verification.”
