Is there any way to extend calibrations on GageTrak PRO? example: I have a group of 86 gages that are to have their calibration extended by 2 months to line up with our annual shutdown week…
I think you’d have to change the due date and reprint every sticker to match to keep it legit. Even that might be shady in the eyes of ISO, I’m not a ISO auditor so I cant say for sure.
I have had to do this before, and it is a real pain. This is the quickest path I have found to do multiple gages like this. This may not work for you, but it helps me make it a bit smoother. Fortunately I have only had to do this a few times.
First, we have a form for changing calibration cycles. We list each gage that will be changed, why it needs to be changed and how we are verifying that it is functional for use until they can be calibrated. Then the calibration tech, the gage owner (department manager) and the Quality manager all must sign. I have this all done, and have the form scanned in onto my computer before I start.
I then have to go into each gages entry and manually change the calibration schedule to the interval I want to extend it out to (example: last day of every 2 months to get to end of year shutdown).
Once I do that, I go into the DUE LISTS and pull up CALIBRATIONS DUE and filter to the date those gages are due (so if due this month, narrow down from Oct 1 to Oct 31). I click the box next to each of those gages I want to extend and click the + button. I will fill out the appropriate information in that pop up window, including CALIBRATION TYPE as EXTEND CALIBRATION and I always click preprint labels to save me from having to print each one individually (time saver).
Once you hit ok, it will populate the calibration list for all those gages-
I will go thru each individual entry and click RESULTS and make it FUNCTIONAL (rather than PASS) but leave the as found and disposition as IN and PASSED (as I have paperwork proving how we determined it is functional in the short term). Make sure you click the completed box too and save. I also will attach the form we have filled out to each calibration entry for reference in case I am questioned by the auditor to show our process.
Now you have to remember that when you have these gages calibrated, you have to go back into each gage and reset the calibration cycle back to 12 months (or whatever your normal cycle is) before entering your calibration or it will only make the next due date however long you had extended it for.
I hope this helps, it is a bit of work, but it is easier for me than doing it one gage at a time.
If you have them linked to templates, will the regular cal interval return upon initiating a new calibration next time or will it keep with the extended one?
Unsure as not all of mine are linked to templates- the gages I have done this on were not linked, so when I forgot to make the change back, when I made a calibration, it only set the cycle to that 2 months again. I had to delete the calibration entries I just made, make the change and re do the calibration entries again. Needless to say, that was really irritating because it wasn’t just one gage… it created a good couple of hours work to fix…![]()