FaciliWorks 8i gives organizations multiple paths from a Service Request (SR) to a Work Order (WO), so teams can match the system to how maintenance actually operates.
Step 1: Service Request (SR) Is Created
Service Requests can be submitted by:
-
Maintenance users with module rights
-
Non-maintenance staff using the optional Service Request module
Once submitted:
-
The request is immediately in the system
-
No emails, phone calls, or sticky notes
-
Status is visible to both requestors and maintenance
Typical SR data includes:
-
Issue description (Problem)
-
Location or asset (if known)
-
Priority
-
Comments or attachments (if enabled)
Step 2: Review, Approval, or Direct Action
This is where FaciliWorks 8i becomes flexible.
Option A: Two-Step Process (SR → Approval → WO)
If approvals are enabled:
-
Maintenance reviews the SR
-
Comments entered here carry forward to the WO
-
If no comments exist, the problem description transfers automatically
-
SR is approved, then converted to a WO
Best for:
-
Regulated environments
-
Budget or safety oversight
-
Centralized planning
Option B: Create a Work Order Directly from the SR Page
If enabled, users can:
-
Create a Work Order directly from the Service Request page
-
Bypass the two-step approval process
-
Bypass converting the SR via the Edit SR menu
This means:
-
SR → WO in one action
-
No additional navigation
-
No approval bottleneck
Best for:
-
Fast-response teams
-
Emergency or reactive maintenance
-
Lean maintenance operations
The Service Request still remains linked—only the path changes.
Step 3: Edit the Service Request (If Needed)
Before conversion (or direct WO creation), maintenance can:
-
Assign or correct the asset
-
Assign a task (repair or PM-related)
-
Adjust priority
-
Cancel duplicate or invalid requests
This ensures the Work Order starts with clean, usable data.
Step 4: Work Order Is Created
Regardless of the path:
-
The Work Order becomes the execution record
-
The Service Request remains linked as the origin
-
Status tracking stays intact
Key distinction:
The SR explains why the work exists.
The WO records how the work was done.
Step 5: Execute the Work Order
Technicians can now:
-
Perform the work
-
Log labor time
-
Record parts usage
-
Add completion notes
-
Attach photos or documents through Attachments
This is where accurate history is built.
Step 6: Complete the Work Order
When the WO is completed:
-
The WO is closed
-
The linked SR is automatically resolved
-
Records are preserved for reporting, audits, and KPIs
Now you can measure:
-
Response time
-
Labor and material costs
-
On-time completion
-
Repeat failures
Why FaciliWorks Separates SRs and WOs
This design:
-
Eliminates “lost” requests
-
Supports both controlled and fast-response workflows
-
Preserves accountability without slowing work
-
Gives management clean data without burdening technicians
You’re not forced into one workflow—you configure the one you need.
-
Do you allow direct WO creation from SRs?
-
When does a two-step approval actually add value?
-
Where do SRs slow your team down today?
-
What data do you wish requestors always included?
Drop your workflow below—every facility runs differently, and that’s the point