# Pre-Audit Checklist (Example Framework)

**URL:** <https://forum.cybermetrics.com/t/pre-audit-checklist-example-framework/142>\
**Category:** Facility Maintenance\
**Created:** [February 9, 2026, 4:19pm UTC](https://forum.cybermetrics.com/t/pre-audit-checklist-example-framework/142 "2026-02-09T16:19:13Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![aavila](https://avatars.discourse-cdn.com/v4/letter/a/a6a055/32.png) [@aavila](https://forum.cybermetrics.com/u/aavila)\
**Post date:** [February 9, 2026, 4:19pm UTC](https://forum.cybermetrics.com/t/pre-audit-checklist-example-framework/142/1 "2026-02-09T16:19:13Z")

</div>

**Facility Maintenance, Asset Care & CMMS**

_This is an example guide. Actual audit expectations may vary by industry, regulatory body, and risk profile._

* * *

**1. Asset Management – Example Expectations**

**What auditors usually want to see (example):**

- A list of critical assets that matches what exists in the field

- Asset records that show location, status, and ownership

- Evidence assets are actively managed, not just listed

**Example questions:**

- “How do you know all critical assets are accounted for?”

- “How do you prevent duplicate or unmanaged assets?”

**Industry notes:**

- Manufacturing: focus on production-critical assets

- Healthcare: life-safety and clinical support equipment

- Facilities: HVAC, electrical, fire systems

* * *

**2. Preventive Maintenance (PM) – Example Review**

**What this often looks like:**

- PM schedules exist for critical assets

- PMs are running automatically, not manually tracked

- Overdue PMs are visible and explainable

**Example questions:**

- “How do you know PMs are being completed on time?”

- “What happens when a PM is late?”

**Industry notes:**

- Pharma/FDA: documented justification for late PMs

- Facilities: seasonal and weather-driven PMs

- Utilities: usage-based or meter-driven PMs

* * *

**3. PM Compliance vs PM Effectiveness (Example)**

**Auditors may look for:**

- PM completion rates

- Evidence PMs are adjusted based on failures

- A feedback loop between PMs and corrective work

**Example evidence:**

- PM frequency changes tied to failure history

- Notes explaining why a PM task was added or removed

**Key takeaway:**  
High compliance with poor outcomes raises questions.

* * *

**4. Work Orders – Example Traceability**

**What “good” looks like:**

- Work orders move through clear statuses

- Completed work orders include who did the work and when

- Supporting notes, labor, or parts are recorded

**Example questions:**

- “Show me the history of work on this asset.”

- “How do you prevent work from being closed without documentation?”

* * *

**5. Service Requests – Example Control**

**Typical expectations:**

- Service requests are tracked in one system

- Requests aren’t lost in emails or phone calls

- Requests are either approved, rejected, or converted

**Example scenario:**

- A department submits a request → maintenance reviews → work order is created (or justified not to)

* * *

**6. Calibration (If Applicable) – Example Evidence**

**What auditors often ask for:**

- A list of calibrated instruments

- Calibration intervals and due dates

- Completed calibration records

**Example documentation:**

- Pass/fail results

- Test point data or range calculations

- Performer and reviewer acknowledgement

**Industry sensitivity:**

- FDA / ISO labs: very high scrutiny

- Facilities: limited to specific safety instruments

* * *

**7. Procedures & Checklists – Example Usage**

**What this may look like:**

- PMs and calibrations reference documented steps

- Checklists match how work is actually performed

- Acknowledgements are used where required

**Example questions:**

- “How do you ensure technicians follow the approved method?”

- “What changes when a procedure is updated?”

* * *

**8. Parts & Inventory – Example Oversight**

**Auditors may review:**

- Availability of critical spares

- Parts tied to PMs or recurring repairs

- Evidence inventory supports maintenance strategy

**Example risk area:**

- Missed PMs due to unavailable parts

* * *

**9. User Access & Controls – Example Review**

**Common expectations:**

- User roles are defined

- Administrative access is limited

- Actions are traceable to individuals

**Example question:**

- “Who can change maintenance or calibration data?”

* * *

**10. Change Control – Example Practices**

**What auditors like to see:**

- PM changes documented

- Calibration interval changes justified

- Configuration changes controlled

**Example explanation:**

- “We increased this PM frequency after repeat failures.”

* * *

**11. Reporting & Evidence – Example Readiness**

**Typical requests:**

- PM completion reports

- Asset maintenance history

- Calibration history

**Best practice:**

- Reports are easy to generate and understood by more than one person

* * *

**12. Exceptions & Deviations – Example Handling**

**Auditors expect:**

- Late or missed work to be visible

- Explanations documented

- Corrective actions tracked

**Key insight:**  
Documented exceptions show control—not failure.

* * *

**13. Field Reality Check – Example Walkthrough**

**What often happens:**

- Auditor selects an asset

- Reviews its CMMS record

- Verifies it physically in the field

**Alignment matters more than perfection.**

* * *

**14. Final Example Self-Check**

Before an audit, try this:

- Pick one asset

- Review one PM

- Review one corrective WO/CM

- (If applicable) review one calibration

If the story is clear and consistent, you’re likely in good shape.

* * *

Audits aren’t about having **zero issues**.  
They’re about proving you have **process, visibility, and control** —and that your CMMS reflects reality.

Many of these audit questions aren’t about doing _more_ work—they’re about whether your CMMS tells a clear, defensible story.

When asset records, PMs, work orders, and exceptions all connect, audits become conversations instead of interrogations.

**Thoughts:**  
• Which area gives you the most trouble during audits: PM compliance, documentation, or asset accuracy?  
• What’s the _first_ thing an auditor usually asks for in your facility?  
• Do you prepare for audits continuously—or scramble right before?